ATH_357_90
3 bedrooms
nullm2
1 bathroom
4 people
Apartment ATH 357B
Elegant Athenian Experience
This newly renovated 90 m² apartment offers a refined combination of contemporary comfort and carefully preserved Bauhaus architectural character in the center of Athens. Located on the 3rd floor of a residential building in Exarcheia, designed and constructed by Kostas Voutsinas in 1937, the apartment benefits from exceptionally well-designed common areas and entrance spaces.
The apartment was carefully preserved, restored, and redesigned by Studio Ephyra and P4architecture, two internationally awarded architecture practices based in Greece, in their first joint collaboration. All furniture, partition walls, marble finishes, and marble countertops were selected and custom-designed by the two studios.
Key features include:
• Architectural Details: High ceilings throughout the apartment, 315 cm, a double-height kitchen, a double-height closet, lighting products by Luceplan, herringbone oak flooring, Italian taps in 316L stainless steel by Superinox, and carefully integrated custom joinery throughout the apartment.
• Bedrooms: Two bedrooms with custom-designed oak wood bed frames and marble details. The mattresses are anatomical, medium- irm, by Premium Strom.
• Study / Guest Room: One study space with a sofa bed that opens into a double bed, allowing the room to function also as an additional sleeping area.
• Kitchen: Kitchen with Tinian marble countertop and travertine marble island, equipped with a Whirlpool induction cooktop and oven.
• Bathroom: One bathroom with a walk-in shower, marble countertops, inwall toilet and concealed flush system, Italian tiles, and Italian taps in 316L stainless steel by Superinox. The apartment also includes a separate laundry space.
• WC: One separate WC with detailed marble finishes, in-wall taps, and inwall toilet.
• Furniture: Fully furnished with custom-made oak wood furniture, Tinian marble details, and integrated hidden storage spaces. The sofas have been custom- made specifically for the apartment, using stain-resistant and hypoallergenic fabrics.
• Balconies: Three private balconies: two facing 3rd September Street and one facing Stournari Street, with views towards the Polytechnic.
• Windows: Original solid wood window frames, carefully maintained and upgraded with A+ energy-rated triple glazing.
• Minimum lease term: 1 month.
Amenities
Wifi
Air conditioning
Heating
Television
Elevator
Wheelchair Accessible
Dish washer
Washing Machine
Wardrobe
Desk
Iron
Ironing Board
Dishes
Cutlery
Oven
Fridge
Shower
Rules
Pets not allowed
Smoking not allowed
Events not allowed
Children not allowed
Cancellation Policy
You can cancel the reservation for free within 14 days before moving.
If you cancel your booking 14 days or more before the move-in date, you’ll get a refund of the entire first rent. If you cancel your booking up to 7 days before the move-in date, you’ll get a refund of half of the first rent. If you cancel your booking less than 6 days before the move-in date, you won’t get a refund of the first rent. The service fee is always refundable. If you send a message to Flatio's Support Team requesting cancelation of the booking ("termination from the start date") within 48 hours after the lease agreement becomes valid, you're entitled to get back all the money you paid for the service fee. After 48 hours, you're entitled to a refund of the service fee in the form of a "voucher" equal to the amount of the service fee you paid. The voucher can be used for your next booking and is valid for 12 months. If the service fee for your next booking is lower than the voucher amount, we'll issue you a new voucher for the remaining amount, valid for 12 months.
Frequently asked questions for this offer
What happens after I make a reservation?
Once you send a reservation request, the landlord is notified that you are interested in their offer. From that moment, they have 24 hours to approve or reject your reservation.
Landlords are mainly interested in the profile of their tenant. Do not forget to fill in all necessary information, add your profile picture, or even make a short video about yourself. Doing that will make you more attractive for the owner and your reservation will more likely get approved.
What is the standard furnishing of flats?
All the apartments on offer on Flatio must meet certain standards. We require fully furnished and equipped ones, dishes, cutlery and internet connection included.
What is a medium-term rent?
The duration of a medium-term rent is usually 1 to 12 months. Most of the landlords offer long-term rents or rents for just a few days, therefore getting a medium-term rent without Flatio is not that easy.
Can I go through the contract before I make a reservation of the housing?
You can take a look at the contract in advance and online with every offer. After you sign it, you will find it in the application My Housing.
While arranging a contract on Flatio, you do not have to worry that it could be disadvantageous for you. Our contracts are made so that we avoid all problems! All of them are the same, used by all the landlords on Flatio.
Can I see my chosen accommodation in person before I sign the lease agreement?
Your time is precious. That's why we've added a virtual tour option to our platform so you can see some of the rentals listed on Flatio from the comfort of your own home.
If a virtual tour isn't available for the accommodation you've chosen, you can contact the landlord and ask them if they're willing to give you a personal tour of the rental unit.
If you move in and find that the rented accommodation doesn't match the information on Flatio at the time the reservation request was sent to the landlord, you can withdraw from the lease agreement under certain circumstances explained in this article in our help center.
Also, under our "secure move-in" policy, we'll assist you with moving to an alternative accommodation if you report within a certain period of time that the rental unit doesn't match the ad and the landlord doesn't fix the problem immediately. You can read the details in our help center.
How can I pay?
On Flatio, you have a variety of payment methods to choose from. You can use your card, payment gateway or bank transfer. Just pick the one which suits you the most.
How can I cancel my reservation?
How you can cancel a reservation varies depending on what stage the reservation is in.
Is your reservation request still waiting for landlord approval? Then you can simply cancel it directly from your My Housing web app!
However, suppose the owner has already approved your reservation request, and you are no longer interested in it. In that case, you can still cancel the reservation before you sign the lease agreement. Just consider that you should do this only in essential cases. Because when the landlord accepts your reservation, their property is stopped being advertised, and they can lose the chance to rent their property to someone else.
Do you have an approved reservation and also a valid agreement? In order to cancel your reservation, contact Flatio customer support well in advance of your contract beginning (the specific time and amount of refund depends on the type of cancelation policy).